Design substrate preparation, corners, joints, penetrations, protection, drainage and discharge as details. Finished ground leads water away and maintenance points remain accessible.
Emergency preparedness · 18 min
Material choice and build-up depend on water exposure, substrate and details. Drainage membranes do not replace required waterproofing, and unprotected waterproofing can be damaged during backfill.
Decision compass
Four questions lead from observation to a clear, safer action.
What needs to be clarified now?
Remember: Observe → assess → choose a safer option → act.

Waterproofing works only as a continuous, protected and tested envelope.
Design substrate preparation, corners, joints, penetrations, protection, drainage and discharge as details. Finished ground leads water away and maintenance points remain accessible.
Inspect substrate, laps, junctions and damage in stages. Complete documented acceptance before backfilling. Repair and recheck suspect areas.
Inspect outlets, access points and interior after heavy rain. Record moisture trends and odour so gradual change is detected early.
Decision training
Correct: B. Photographs, plans, specialist checks and a functional test show whether the proposed solution works safely at the actual site.