For “Define which services must work independently and for how long”, you check the required values, the limits of each component and the conditions at the installation site. You then record the result, reserve and an independent backup.
Your learning progressSaved on this device.
Lesson guide
Procedure
Foundation12–18 min
Prepare, complete each step and verify the result.
Before you start
Document essential functions, operating periods, resources and applicable component limits before work starts.
Isolate energy sources, verify protective devices and identify work reserved for qualified trades.
Success criteria
Target, period and boundary for define which services must work independently and for how long recorded
Inputs and outputs measured with units
Sequence and polarity checked against data sheets
Practical task
Complete “Step 1” and record every value with unit and operating condition.
Name the stop condition and the safe fallback before continuing.
If conditions change
Reduce demand or test a smaller isolated system before increasing capacity.
Use a documented safe fallback when a component, resource or measurement is uncertain.
Detect and correct errors
A value without unit or operating condition must be measured again and recorded.
On heat, smell, vibration, leakage or unstable readings: stop, isolate and identify the cause before restart.
Learning objectives
For power, water, heat and food, write down what must keep working and for how many days.
Record the required supplies, resupply options, maintenance work and the person able to operate each system.
Measure the result and compare it with the permitted limits
01
What to check
For power, water, heat and food, write down what must keep working and for how many days. Record the required supplies, resupply options, maintenance work and the person able to operate each system.
REAL SYSTEM VIEW + TECHNICAL DETAIL 1/1
Physical system boundary
For power, water, heat and food, write down what must keep working and for how many days. Record the required supplies, resupply options, maintenance work and the person able to operate each system.
REAL SYSTEM VIEW
The scene shows how heat, water, food, energy and health set real limits.
Meaning: Generation, storage, loads and an independent backup are labelled and connected by directional energy and supply routes. “Seven days of drinking water and lighting” can be tested. “Indefinitely self-reliant” is not a useful plan without winter figures, resupply and spare parts.
02
Dependencies and limits
Start with a written inventory of people, essential functions, resources and the longest tolerable interruption. Separate comfort from health and safety.
03
Plan in the right order
Work in layers: reduce demand first, size stocks and generation second, then test an independent fallback. Record every figure with date, measurement method and assumptions.
04
Measure, maintain and switch to backup
Judge each solution by capacity, duration, resupply and operability. A system is only as resilient as its scarcest resource and the person operating it under pressure.
05
Worked calculation or decision
“Seven days of drinking water and lighting” can be tested. “Indefinitely self-reliant” is not a useful plan without winter figures, resupply and spare parts.
PROCEDURE
Carry out the lesson step by step
01 · Step 1
For power, water, heat and food, write down what must keep working and for how many days.
02 · Step 2
Record the required supplies, resupply options, maintenance work and the person able to operate each system.
03 · Check the result
Measure the result, record its unit and operating condition, and compare it with the permitted limit for the component before continuing.
Materials and tools
Demand and risk log
Meter or manufacturer data
Calendar and maintenance list
Labelled reserve containers
Safety and stop conditions
Never make essential medical equipment depend on one DIY solution.
On gas smell, smoke, abnormal heat or damaged wiring, shut down, keep clear and call qualified help.
Typical mistakes
Using the headline value for “Define which services must work independently and for how long” without checking its unit and operating condition
Buying or connecting components before compatibility and protection limits are documented
Treating nominal capacity, peak output or one favourable measurement as continuously usable supply
Continuing after heat, smell, vibration, leakage, contamination or unstable readings appears
Final checklist
Target, period and boundary for define which services must work independently and for how long recorded
Inputs and outputs measured with units
Sequence and polarity checked against data sheets
Losses, temperature, season and reserve included
Isolation and stop condition tested before full load
Result, anomalies and next inspection entered in the log
DECISION CHECK
The measured result for “Define which services must work independently and for how long” differs from the planning value and one stop indicator appears. What comes next?
Average it with the best previous reading
Stop, isolate the affected path, identify the cause and repeat one controlled step
Raise the fuse or alarm threshold
Show answer
Correct answer: Stop, isolate the affected path, identify the cause and repeat one controlled step
The worked reference was: “Seven days of drinking water and lighting” can be tested. “Indefinitely self-reliant” is not a useful plan without winter figures, resupply and spare parts. A stop indicator invalidates continued operation until its cause and the relevant limit are resolved.
Continue in FIGHTandSURVIVE
Household emergency plan →Define which services must work independently and for how long | FIGHTandSURVIVE | FIGHTandSURVIVE